Working in a former industrial site turned loft on the Meuse quays in Liège means monumental spaces. When the owners mandated us for this vast open volume, ceiling height and metal structures demanded immediate logistical adaptation.

In such an atypical property, excessiveness imposes large-scale site organisation.

Monumental volumes mezzanines + height
Secured lifting polished concrete spared
Targeted sorting art + metal

The real challenge: ceiling heights and mixed large objects

  • High access: raised mezzanines and open volumes demanding adapted securing and carrying.
  • Mix: contemporary design living with industrial remains and heavy art pieces.
  • Outbound flows: large overall volume demanding a sustained loading pace to free space fast.

⚠️ Polished concrete marks fast

Without specific protection, lifting and rolling scar polished concrete for good. The loft is protected like period parquet.

Our approach on site

  1. Operational zoning: main living zone separated from technical annexes to keep teams fluid.
  2. Secured handling: lifting gear and specific protection to preserve floors.
  3. Targeted sorting and removal: split across artistic recovery, partner dealers and metal recycling.

💡 Big atypical volumes? The 90 m³ method

Zoning and rotations as on our La Louvière job.

The result

The loft was fully freed and cleaned, regaining its architectural purity and original raw volume.

🏭 A loft or atypical volume in Liège?

Zoning, lifting and targeted sorting. Free quote within 48h.